Open main menu

Industry Tech Tree

Industry

Agriculture

Modern Agriculture

  • Historic Year: 1936
  • Prerequisites: None
  • Effects:
  • Manpower Growth +5%

5 -   - Scientific Plowing Technique

5 -   - Scientific Sowing Technique

5 -   - Scientific Mowing Technique

5 -   - Scientific Cleaning Technique

6 -   - Scientific Agricultural Processes (D)

Mechanized Agriculture

  • Historic Year: 1936
  • Prerequisites:
  • Effects:
  • Manpower Growth +5%

6 -   - Plowing Machine

6 -   - Sowing Machine

6 -   - Mowing Machines

6 -   - Cleaning Machines

7 -   - Mechanized Agricultural Processes (D)

Agrichemistry

  • Historic Year: 1936
  • Prerequisites:
  • Effects:
  • Manpower Growth +5%

7 -   - Synthetic Fertilizers

7 -   - Synthetic Insecticides

7 -   - Synthetic Herbicides

7 -   - Synthetic Fungicides

8 -   - Hybridization

Agricultural Production

  • Historic Year: 1936
  • Prerequisites:
  • Effects:
  • Manpower growth +5%

8 -   - Industrial Pasteurization

8 -   - Large Scale Refrigeration

8 -   - Sterile Packaging

8 -   - Dehydration Techniques

9 -   - Agrimanagement Processes (D)

Manufacturing

Basic Machine Tools

  • Historic Year: 1936
  • Prerequisites: None
  • Effects:
  • Industrial Efficiency total 5

5 -   - Cemented Tungsten Carbide

5 -   - Precision Techniques

5 -   - Basic Welding Techniques

6 -   - High Temperature Resistance

7 -   - Basic Machine Tools Development Process (D)

Improved Machine Tools

  • Historic Year: 1937
  • Prerequisites:
  • Effects:
  • Industrial Efficiency total 5

6 -   - Industrial Ceramic

6 -   - Sensor Techniques

6 -   - Improved Welding Techniques

7 -   - High Speed Performance

8 -   - Improved Machine Tools Development Process (D)

Advanced Machine Tools

  • Historic Year: 1938
  • Prerequisites:
  • Effects:
  • Industrial Efficiency total 5

7 -   - Industrial Diamonds

7 -   - Automation

7 -   - Advanced Welding Techniques

8 -   - Very High Speed Performance

9 -   - Advanced Machine Tools Development Process (D)

Basic Construction Engineering

  • Historic Year: 1936
  • Prerequisites: None
  • Effects:
  • Our troops will now dig in when not moving.
  • New Building Allowed: infrastructure
  • New Building Allowed: ic
  • New Building Allowed: land_fort
  • New Building Allowed: coastal_fort

5 -   - Basic Standardization

5 -   - Basic Quality Control

5 -   - Basic Reliability Engineering

6 -   - Basic Test Planning

7 -   - Basic Construction Engineering Development Process (D)

Improved Construction Engineering

  • Historic Year: 1937
  • Prerequisites:
  • Effects:
  • New Building Allowed: air_base
  • New Building Allowed: naval_base
  • Production Bonus: land_fort 50
  • Production Bonus: coastal_fort 50

6 -   - Improved Standardization

6 -   - Improved Quality Control

6 -   - Improved Reliability Engineering

7 -   - Improved Test Planning

8 -   - Improved Construction Engineering Development Process (D)

Advanced Construction Engineering

  • Historic Year: 1938
  • Prerequisites:
  • Effects:
  • Production Bonus: land_fort 50
  • Production Bonus: coastal_fort 50

7 -   - Advanced Standardization

7 -   - Advanced Quality Control

7 -   - Advanced Reliability Engineering

8 -   - Advanced Test Planning

9 -   - Advanced Construction Engineering Development Process (D)

Production Control

  • Historic Year: 1939
  • Prerequisites:
  • Effects:
  • Industrial Efficiency supplies 5

7 -   - Mass Production

7 -   - Scientific Management

7 -   - Continuous Improvement

7 -   - Setup Time Reduction

8 -   - Production Control Development Process (D)

Production Planning

  • Historic Year: 1939
  • Prerequisites:
  • Effects:
  • Industrial Efficiency supplies 5

7 -   - General Production Planning

7 -   - Inventory Planning

7 -   - Resource Queue System

7 -   - Advanced Worker Time Tables

8 -   - Production Planning Development Process (D)

Assembly Line Experimentation

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Industrial Efficiency supplies 15

8 -   - Modular Design

8 -   - Platform Development

8 -   - Sectional Assembly

8 -   - Fracture Mechanics

10 -   - Experimentation Process (D)

Aircraft Assembly Line

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Time interceptor -20
  • Time multi_role -20
  • Time escort -20
  • Time cas -20
  • Time naval_bomber -20
  • Time strategic_bomber -20
  • Time tactical_bomber -20
  • Time transport_plane -20
  • Time cag -20

10 -   - Aircraft Modules

10 -   - Environmental Tests

10 -   - Propulsion Adaptation

10 -   - Assembly Line Process

10 -   - Production Tests (D)

Ship Assembly Line

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Time battlecruiser -20
  • Time battleship -20
  • Time carrier -20
  • Time destroyer -20
  • Time heavy_cruiser -20
  • Time light_cruiser -20
  • Time submarine -20
  • Time transport -20
  • Production Bonus: transports 20
  • Production Bonus: escorts 20

10 -   - Ship Modules

10 -   - Environmental Tests

10 -   - Propulsion Adaptation

10 -   - Assembly Line Process

10 -   - Production Tests (D)

Vehicle Assembly Line

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Time armor -20
  • Time light_armor -20
  • Time light_armor_brigade -20
  • Time mechanized -13
  • Time motorized -13
  • Time armored_car -20
  • Time heavy_armor -20
  • Time super_heavy_armor -20
  • Time tank_destroyer -20
  • Time sp_artillery -20
  • Time sp_rct_artillery -20

10 -   - Vehicle Modules

10 -   - Environmental Tests

10 -   - Propulsion Adaptation

10 -   - Assembly Line Process

10 -   - Production Tests (D)

Rocket Assembly Line

  • Historic Year: 1942
  • Prerequisites:
  • Effects:
  • Time flying_bomb -20
  • Time flying_rocket -20

10 -   - Rocket Modules

10 -   - Environmental Tests

10 -   - Propulsion Adaptation

10 -   - Assembly Line Process

10 -   - Production Tests (D)

Small Arms Assembly Line

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Time infantry -20
  • Time cavalry -20
  • Time militia -20
  • Time garrison -20
  • Time police -10
  • Time paratrooper -10
  • Time bergsjaeger -10
  • Time marine -10
  • Time engineer -10
  • Time mechanized -7
  • Time motorized -7
  • Time anti_tank -20
  • Time anti_air -20
  • Time artillery -20
  • Time rocket_artillery -20

10 -   - Modular Construction

10 -   - Environmental Tests

10 -   - Efficiency Tests

10 -   - Assembly Line Process

10 -   - Production Tests (D)

Synthetic Oil

Basic Oil Refining

  • Historic Year: 1936
  • Prerequisites: None
  • Effects:
  • Industrial Multiplier energy_to_oil 0.1

7 -   - Basic Distillation

7 -   - Basic Cracker

7 -   - Basic Isomerisation

7 -   - Basic Hydrogen Treatment

8 -   - Basic Test Facility (D)

Improved Oil Refining

  • Historic Year: 1938
  • Prerequisites:
  • Effects:
  • Industrial Multiplier energy_to_oil 0.25

7 -   - Improved Distillation

7 -   - Improved Cracker

7 -   - Improved Isomerisation

7 -   - Improved Hydrogen Treatment

8 -   - Improved Test Facility (D)

Advanced Oil Refining

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Industrial Multiplier energy_to_oil 0.4

8 -   - Advanced Distillation

8 -   - Advanced Cracker

8 -   - Advanced Isomerisation

8 -   - Advanced Hydrogen Treatment

9 -   - Advanced Test Facility (D)

Basic Synthetic Oil Plant

  • Historic Year: 1941
  • Prerequisites:
  • Effects:
  • Industrial Multiplier energy_to_oil 0.6

8 -   - Basic Catalysts

8 -   - Basic Reactors

8 -   - Basic Product Processing

8 -   - Basic Feedstock Preparation

10 -   - Basic Oil Plant Prototype Tests (D)

Improved Synthetic Oil Plant

  • Historic Year: 1942
  • Prerequisites:
  • Effects:
  • Industrial Multiplier energy_to_oil 0.75

8 -   - Improved Catalysts

8 -   - Improved Reactors

8 -   - Improved Product Processing

8 -   - Improved Feedstock Preparation

10 -   - Improved Oil Plant Prototype Tests (D)

Advanced Synthetic Oil Plant

  • Historic Year: 1943
  • Prerequisites:
  • Effects:
  • Industrial Multiplier energy_to_oil 0.9

8 -   - Advanced Catalysts

8 -   - Advanced Reactors

8 -   - Advanced Product Processing

8 -   - Advanced Feedstock Preparation

10 -   - Advanced Oil Plant Prototype Tests (D)

Cryptography

Census Tabulating Machine

  • Historic Year: 1936
  • Prerequisites: None
  • Effects:
  • Research Modifier: 5

8 -   - Fine Mechanics

7 -   - Manual Reconfiguration

7 -   - Card Storage and Sorting

3 -   - Punch Cards

10 -   - CT Machine Prototype Tests (D)

Basic Computing Machine

  • Historic Year: 1936
  • Prerequisites:
  • Effects:
  • Research Modifier: 5

8 -   - Applied Mathematics

8 -   - Control and Arithmetic Unit

8 -   - Memory Device

8 -   - Punch Tape and Reader

8 -   - Basic Computing Machine Prototype Tests (D)

Improved Computing Machine

  • Historic Year: 1938
  • Prerequisites:
  • Effects:
  • Research Modifier: 5

8 -   - Machine Code

8 -   - Control and Arithmetic Unit

8 -   - Data Storage Relays

8 -   - Punch Tape and Reader

8 -   - Improved Computing Machine Prototype Tests (D)

Advanced Computing Machine

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Research Modifier: 5
  • May lead to . 7140

8 -   - Assembler Languages

8 -   - Control and Arithmetic Unit

8 -   - Multiple Data Storage Relays

8 -   - Multiple Punch Tapes and Readers

8 -   - Advanced Computing Machine Prototype Tests (D)

Basic Encryption Devices

  • Historic Year: 1937
  • Prerequisites:
  • Effects:
  • IntOp Chance them -15
  • Surprise Chance naval 15
  • Surprise Chance land 15
  • Surprise Chance air 15
  • Army detection Chance them -15

7 -   - Keyboard

7 -   - Portable battery

7 -   - 3-Rotor system

7 -   - Basic Reflector

7 -   - Basic Code

Basic Decryption Devices

  • Historic Year: 1938
  • Prerequisites:
  • Effects:
  • IntOp Chance us 25
  • Surprise Chance naval 15
  • Surprise Chance land 15
  • Surprise Chance air 15
  • Army detection Chance us 15

8 -   - Identification of Message Keys

8 -   - Identification of Cribs

8 -   - Basic Cryptographical Mathematical Theory

8 -   - Special Decryption Teams

8 -   - Basic Computing Machine Support

Improved Encryption Devices

  • Historic Year: 1939
  • Prerequisites:
  • Effects:
  • IntOp Chance them -15
  • Surprise Chance naval 15
  • Surprise Chance land 15
  • Surprise Chance air 15
  • Army detection Chance them -15

7 -   - Binary system characters

7 -   - Improved powersource

7 -   - 6-rotor system

7 -   - Double teleprinter

7 -   - Unique settings

Improved Decryption Devices

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • IntOp Chance us 25
  • Surprise Chance naval 15
  • Surprise Chance land 15
  • Surprise Chance air 15
  • Army detection Chance us 15

8 -   - Identification of Multiple Message Keys

8 -   - Identification of Repetitions

8 -   - Theoretical Computer

8 -   - Special Decryption Facility

8 -   - Improved Computing Machine Support

Advanced Encryption Devices

  • Historic Year: 1941
  • Prerequisites:
  • Effects:
  • IntOp Chance them -15
  • Surprise Chance naval 15
  • Surprise Chance land 15
  • Surprise Chance air 15
  • Army detection Chance them -15

7 -   - 5-Bit combinations

7 -   - Advanced electro-mechanics

7 -   - 10 Rotor-system

7 -   - Simultaneous encryption

7 -   - One-time code pads

Advanced Decryption Device

  • Historic Year: 1942
  • Prerequisites:
  • Effects:
  • IntOp Chance us 25
  • Surprise Chance naval 15
  • Surprise Chance land 15
  • Surprise Chance air 15
  • Army detection Chance us 15

8 -   - Identification of Parallel Texts

8 -   - Advanced Reconstruction

8 -   - Advanced Prime Number Theory

8 -   - Multiple Cooperating Decryption Facilities

8 -   - Advanced Computing Machine Support

Radar

Basic Decimetric Radar Warning Sites

  • Historic Year: 1937
  • Prerequisites: None
  • Effects:
  • New Building Allowed: radar_station
  • Radar Station Efficiency: 5

6 -   - Basic Antenna

6 -   - Transmitter Frequency 10m/30MHz

6 -   - Basic Mechanical Structure

6 -   - Basic Manual Plotting Device

6 -   - Basic Air Defence Integration

Improved Decimetric Radar Warning Sites

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • Radar Station Efficiency: 10

7 -   - Improved Antenna

7 -   - Transmitter Frequency 1.5m/200MHz

7 -   - Improved Mechanical Structure

7 -   - Improved Manual Plotting Device

7 -   - Improved Air Defence Integration

Advanced Decimetric Radar Warning Sites

  • Historic Year: 1942
  • Prerequisites:
  • Effects:
  • Radar Station Efficiency: 10

7 -   - Advanced Antenna

7 -   - Transmitter Frequency 50cm/600MHz

7 -   - Advanced Mechanical Structure

7 -   - Advanced Manual Plotting Device

7 -   - Advanced Air Defence Integration

Basic Centimetric Radar Warning Sites

  • Historic Year: 1942
  • Prerequisites:
  • Effects:
  • Radar Station Efficiency: 5

7 -   - Tower Antenna

9 -   - Transmitter Frequency 10cm/3GHz

7 -   - Basic Electrical Structure

8 -   - Basic Electromechanical Plotting Device

10 -   - Basic Air Defence Network

Improved Centimetric Radar Warning Sites

  • Historic Year: 1943
  • Prerequisites:
  • Effects:
  • Radar Station Efficiency: 20

8 -   - Movable Antenna

10 -   - Transmitter Frequency 12cm/4GHz

8 -   - Improved Electrical Structure

9 -   - Improved Electromechanical Plotting Device

10 -   - Improved Air Defence Network

Advanced Centimetric Radar Warning Sites

  • Historic Year: 1944
  • Prerequisites:
  • Effects:
  • Radar Station Efficiency: 25

10 -   - Transportable Antenna

10 -   - Transmitter Frequency 15cm/5GHz

10 -   - Advanced Electrical Structure

10 -   - Advanced Electromechanical Plotting Device

10 -   - Advanced Air Defence Network

Nuclear

Faculty of Atomic Research

  • Historic Year: 1936
  • Prerequisites: None
  • Effects: None

10 -   - Department of Atomic Physics

10 -   - Department of Radioactivity

10 -   - Department of Higher Mathematics

10 -   - Department of Astro-Physics

10 -   - Department of Physical Chemistry

Atomic Research Laboratories

  • Historic Year: 1936
  • Prerequisites:
  • Effects: None

10 -   - X-ray Spectrometry Lab

10 -   - Cathode Spectrometry Lab

10 -   - Anodic Spectrometry Lab

10 -   - Radionuclide Lab

10 -   - Transmutation Lab

Faculty of Nuclear Research

  • Historic Year: 1939
  • Prerequisites:
  • Effects: None

10 -   - Department of Nuclear Physics

10 -   - Department of High Energy Radiation

10 -   - Department of Mathematical Physics

10 -   - Department of Relativistic Mechanics

10 -   - Department of Nuclear Chemistry

Isotope Separation Facility

  • Historic Year: 1941
  • Prerequisites:
  • Effects:
  • New Building Allowed: nuclear_reactor
  • Max Reactor Size: 1

10 -   - Experimental Proof of the Equivalence of Mass and Energy

10 -   - Radioactive Material Analysis

10 -   - Laboratory produced Fission

10 -   - Chain Reaction Process Discovered

10 -   - Isotope Separation Process (D)

Nuclear Fuel Analysis

  • Historic Year: 1941
  • Prerequisites:
  • Effects:
  • Max Reactor Size: 2

10 -   - Betatron Particle Accelerator

10 -   - Uranium 238

10 -   - Thorium 232

10 -   - Uranium 235

10 -   - Material Stability Tests (D)

Experimental Reactor

  • Historic Year: 1941
  • Prerequisites:
  • Effects:
  • Max Reactor Size: 3

10 -   - Nuclear Reactor Design

10 -   - Reflector Material Tests

10 -   - Moderator Material Tests

10 -   - Heavy Water Plant

10 -   - Reactor Prototype Tests (D)

Nuclear Reactor Operability

  • Historic Year: 1943
  • Prerequisites:
  • Effects:
  • Max Reactor Size: 4

10 -   - Core Structure

10 -   - Reflector

10 -   - Moderator

10 -   - Applied Rare Minerals

10 -   - Operationability Tests (D)

Nuclear Power Production

  • Historic Year: 1944
  • Prerequisites:
  • Effects:
  • Max Reactor Size: 5
  • production in changed by -4 50
  • May lead to . 7170
  • May lead to . 7200
  • May lead to . 7210
  • May lead to . 7220
  • May lead to . 7230

10 -   - Nuclear Power Plant Design

10 -   - Nuclear Propulsion Design

10 -   - Emergency Shut-down System

10 -   - Nuclear Waste Disposal

10 -   - Power Plant Prototype Tests (D)

Rocket

Rocket Test and Research Facility

  • Historic Year: 1936
  • Prerequisites: None
  • Effects:
  • New Building Allowed: rocket_test

7 -   - Wind Tunnels

7 -   - Test Range

7 -   - Telemetrics Station

7 -   - Rocket Fuels

7 -   - Basic Rocket Flight Tests (D)

Rocket Engine

  • Historic Year: 1939
  • Prerequisites:
  • Effects:
  • May lead to . 7010
  • May lead to . 7100
  • May lead to . 7260
  • May lead to . 7270

8 -   - Chamber

8 -   - Diffuser

8 -   - Nozzle

8 -   - Fuel injector

8 -   - Burner

Turbojet Engine

  • Historic Year: 1939
  • Prerequisites:
  • Effects:
  • May lead to . 7030
  • May lead to . 7050
  • May lead to . 7060
  • May lead to . 7070
  • May lead to . 7080
  • May lead to . 7090

8 -   - Compressor

8 -   - Fan

8 -   - Air intake

8 -   - Fuel injector

8 -   - Burner

Flying Bomb Development

  • Historic Year: 1940
  • Prerequisites:
  • Effects:
  • May lead to . 7100

6 -   - Solid Fuel Rocket Engine

6 -   - Gyroscope Autopilot

6 -   - Launch Catapult

6 -   - Modified Steering Fens

6 -   - Trajectory Test Flights (D)

Flying Rocket Development

  • Historic Year: 1941
  • Prerequisites:
  • Effects:
  • May lead to . 7110

7 -   - Liquid Fuel Rocket Engine

7 -   - Advanced Gyroscope Autopilot

7 -   - Mobile Launch Sites

7 -   - Reinforced Ribs

7 -   - Trajectory Test Flights (D)